• Welcome! The TrekBBS is the number one place to chat about Star Trek with like-minded fans.
    If you are not already a member then please register an account and join in the discussion!

Set blueprint exchange

It had already been redressed at least three times during Season 2 — as the bridge of the Lantree in "Unnatural Selection," the courtroom in "The Measure of a Man," and the science lab in "Pen Pals."
 
It also finally gives us a good confirmation that the corridors and room sets are 8' tall and the roof lights are 2' taller above that.
 
Does anyone have a good resource on Voyager's OPS console? The blueprints @Redgeneral provided have the dimensions for the side consoles, but not OPS. Which is a bit of a shame :-( I did find the Equinox schematics, which are quite helpful, especially the annotated version.

Speaking of which... I hope RG is doing well. It's been a while since he was here last time...
 
Apologies if this was shared before but I didn't see it in a search. If so, disregard, but last night I stumbled into a blueprint of Kirk's Star Trek II TV cabin (link). This is a post I did in Donny's thread where I discussed the blueprint re photos seen on the set under construction. Even if you've seen the blueprint you might not have seen the set construction photos.

EDIT: Maybe others have seen it, but I just found (here) this low-quality image of a blueprint for the TV set:

View attachment 14590

...and you can see the office area is MUCH smaller than the final set, the sonic shower, etc., is positioned differently, and there's no door into the "bedroom" side. Instead, there's one in the "office".

This fit with these photos. Here (lower left) you can see the quarters under construction. The caption says the set is being "widened", so they knocked out the far wall out where that viewscreen ended up.
42637235381_fcd33f270a_o.png


And here, upper left. Notice the absence of the door to the corridor of the foyer that contains it, which matches the blueprint.
42637235191_69f40bb089_o.png


Finally in this one (right) you see the set earlier along that in the photo above. Note the door in the wall is in the office area, as per the blueprint.
42637235591_af7c4e8c48_o.png


When they revamped the set they put in the foyer leading into the bedroom and the door in the office was lost behind the curved walls.

Interestingly, Mike Minor's concept sketch for the quarters features those wall plant-ons seen in sickbay (LINK) and features the "red trim overhang" noted in the first page of set photos I posted above.

I got no idea what's going on with the backsides of walls seen through the door here. Seems like that's the door into Kirk's TV office, so maybe those are wild walls standing in there. I do notice the doors are centered under the corridor beams and centered on wall sections, which would be helpful in doing a TV corridor.
15654905383_6bd66fc096_o.jpg
 
Last edited:
If you are not already a member then please register an account and join in the discussion!

Sign up / Register


Back
Top