The Discovery Bridge Took one designer over a year and 160 hours to design. Before he got it several concepts were already made. In addition to the main designer another designer also put 160 hours into it to help refine it.
It is 2-3 times larger than any previous bridge.
The electronics in the captains chair are actually functional in some ways.
I got hints that they MIGHT be planning on showing what's above the bridge in that blue dome as they mentioned several times that the set is 3 stories as the original plan was to include that top floor. (Prob got cut season 1 for $).