• Welcome! The TrekBBS is the number one place to chat about Star Trek with like-minded fans.
    If you are not already a member then please register an account and join in the discussion!

NCC-1701 USS Enterprise Deck by Deck - WIP

Status
Not open for further replies.
progress_082312_1.jpg

progress_082312_2.jpg

progress_082312_3.jpg

progress_082312_4.jpg


More work completed on the water redistribution system. Really shaping up.
 
progress_092612_01.jpg

progress_092612_02.jpg

progress_092612_03.jpg

progress_092612_04.jpg


[br]
More upgrades and more work ;)
Deck 4 was pretty out of whack once it was reimported. Had to go back to the original
buildup and check placement on all the pieces. Finally got it in place and correct. Thought
I had this done before; but, some of the parts were still a bit off. So, I'm off to the races
again. The images here show some mods in progress. The Bridge deck floor has finally been
hacked down into floor and ceiling sections. With that done, the remainder of the bracing
for that deck can be built and tied into the lower structure. I've dealt with decks 2-4 as
a single unit up to now. And they're still largely inseperable as the structure all ties together
obviously.

On deck 4, you can see some placeholders protruding through the outer hull. These show
where the limits for the water tanks are and where plumbing and ductwork are to be routed.
The structural members for decks 1-4 will all be generated and tied together while the dressout
for decks 3 & 4 is done.
 
Those are truly beautiful images - I did not expect that! The pattern of shadows is something else. Eagerly awaiting more, as always :-)
 
Thank you. And, yeah, the shadowplay is pretty amazing. Not always what I expect; but, nice to look at. Definitely gives a sense of realism to the images.

progress_092812_01.jpg

progress_092812_02.jpg

progress_092812_03.jpg

progress_092812_04.jpg


This is the latest. You can see here the work has now been done in crafting the basis for the sides of the watertanks.. essentially bulkheads that will have a pressure door access
once finished. It's not on the plans; but, I don't know how you have a storage space that large with no access to do
inspections or cleaning as needed.

The first of the support structural frames can be seen between bulkheads in view as well. This will wind up being much added to and tweaked; but, the base is there now to work from. Both took quite a bit of time to derive; but, happy so far with the outcome. The last image shows a set of water towers in place. These look small to the space; but, combined with small pumps on the other decks, they'll serve to move water quite well throughout the ship. They need some work yet as the material broke on import and needs reapplied; but, very happy with this as well. Next will be work to the floors in this section. Haven't decided exactly how to do them yet; but, have some really good ideas brewing.
 
progress_122412_01_zps1465ec56.jpg

progress_122512_01_zps7c61b083.jpg

progress_122512_02_zps0bf0eb53.jpg

progress_122512_03_zpsa94e5238.jpg

progress_122512_04_zpse4c3f405.jpg

progress_122512_05_zpsbeed5593.jpg

progress_122512_06_zpsaf5cb7d2.jpg

progress_122512_07_zps0cc29b3b.jpg

progress_122512_08_zps6d1eb093.jpg

progress_122512_09_zps5e7f0876.jpg


Been working on finishing the plumbing for the water storage section of deck 4. You can see in the first
few images some thinking going on as to how I was going to handle floor bracing in the exposed area.
Didn't like the first approach, dumped it and went for something similar to what I did with the framing on
the Bridge deck. Overall, seems to be coming along well, so.. back to work. Enjoy!
 
Brilliant stuff! Will you be including access points for personnel? Small crawl ways and such? Or do you think it would be more of a remove ceiling and wall panels for accessing any points of issue? That actually seems to make the most sense with TOS ships.

But ya- good work. I'm really enjoying this.
 
Brilliant stuff! Will you be including access points for personnel? Small crawl ways and such? Or do you think it would be more of a remove ceiling and wall panels for accessing any points of issue? That actually seems to make the most sense with TOS ships.

But ya- good work. I'm really enjoying this.

Thank you. There will be access point(s); but, I haven't made a decision yet as whether to Go deck 5 corridor access or deck 4 crawl space. There are advantages to both; but, I think I'm liking deck 5 access better. Neither is on the floorplans; so, ..
;)
 
I continue to be impressed by your persistence, progress, and stunning achievements on this project. This is a feel-good thread. :rommie:
 
progress_122812_00_zps74d5218f.jpg

progress_122812_01_zpsd3721164.jpg

progress_122812_02_zpsb101d2a5.jpg

progress_122812_03_zps99d98780.jpg

progress_122812_04_zps76271220.jpg


Thanks again ;)

This is the latest. Still working on cleanup of the deck 4 framing. Big job; but, had to be done in order
to have a base mounting point for the deck 2 & 3 framing. The Blue necklace shaped spar will be the
central mount point for the framing on the upper decks. Since that is now in place, I've already derived
a base model to make the framing supports from for the upper decks. I also split the deck 4 walls for
inner and outer hull sections. The last image shows this as well as work done to the deck 4 flooring.
Been a very long and busy day of editing. Very pleased with the result though there's still a long way
to go to complete this section of the ship. Plowing forward.

And, Blssdwlf, yeah, the polycount passed batSh*tnuts a long time ago. I don't even want to know where it is at the moment myself lol
 
progress_123012_00_zps82b9406d.jpg

progress_123012_01_zpsd14ac3b0.jpg

progress_123112_01_zps31e8f5d8.jpg

progress_123112_02_zps8f7dc513.jpg


Outer ribbing has all been trimmed and cleaned. They were booleaned to mate up with the "necklace"
ring I spoke of earlier. A few more mods will be needed to allow for the PWT feed through the aft
of the deck; but, no sweat. The last images show the buildup of the ribbing for decks 2 and 3 in
progress. Back to work ;)
 
Ok, still working the superstructure for decks 2-4; but, nearing completion.

progress_022713_01_zps6ccc9259.jpg


This was in dozens of pieces as of the time this render was done. After a week worth of eyeballing,
measuring and stitching bits together, this is now largely in two pieces and I may have another update
yet tonight. I rechecked position on the windows and resultantly dropped the height of the window
placement on deck 2. The outer and inner hull sections have been cut to match the new placement.
Will have to mod the lowpolly skins as well; but, such is life.. Still workin it tonight; so, back at it.
 
Still workin; but, here's another update in place..
progress_022813_01_zps7c2f46d4.jpg


Still have a number of things to do; but, everything has been combined at this point. Now I have to
mod it for the bridge deck floor, gangway and the turbolift passthrough/support. Framing for the
observatory door is already done.
 
Status
Not open for further replies.
If you are not already a member then please register an account and join in the discussion!

Sign up / Register


Back
Top