• Welcome! The TrekBBS is the number one place to chat about Star Trek with like-minded fans.
    If you are not already a member then please register an account and join in the discussion!

Set blueprint exchange

Can anyone recall any other uses?

It's not from the shows or movies , but they were used as the chairs on the bridge simulator in the Starfleet Academy computer game. The physical chairs, at least. On full-CG bridges, they used the TWOK-style chairs to go with their TWOK-style bridge. The captain's chair also seems to be the TFF version.
 
Last edited:
The TFF bridge chairs were used everywhere over the years... but the original bridge chairs for TMP-TVH seem to have never been used. Post 1986 I've noticed that the chairs only turn up in "The Naked Now", "The Battle" and then "The Outrageous Okona", as the chair on the bridge of his freighter. The one he sits in.
http://tng.trekcore.com/gallery/albums/s2/2x04/okona015.jpg

Sidenote... one of the big chairs from TSFS's version of the Excelsior turned up in "Home Soil:, knocked over in the lab set, without the big green light at the base. http://tng.trekcore.com/gallery/albums/s1/1x17/homesoil087.jpg

I would have thought they would have used these chairs more, since I've never seen them turn up at auctions over the years.
 
I was watching "The Battle" last night and noticed that in one scene on the Stargazer bridge that the headrest for the Navigator's chair was turned upside down, but remedied later in the ep.
 
Guys, if we don't have this, we should.

https://www.etsy.com/listing/540268160/1-star-trek-tng-set-blueprint-epi-icarus

They give the best close up shots of the small science lab and the battle bridge + ready room layouts that I've seen thus far.

Also, obviously, the gym layout from Icarus factor.

Also, Starbase 515's exterior from Samaritan Snare:
https://www.etsy.com/au/listing/540272048/1-star-trek-tng-set-blueprint-epi?ref=related-2

Ferengi Bridge and Hathaway engineering:
https://www.etsy.com/au/listing/554070969/1-star-trek-tng-set-blueprint-epi-peak?ref=related-3

And this:

https://www.astromart.com/classifieds/details.asp?classified_id=945597
 
Haha, is that the door that Wesley couldn't figure out? Although I think they went with a different design in the episode.
 
Those are great. The description at the second site says they'll send more pics if someone emails them. Definitely do that!
 
m
Guys, if we don't have this, we should.

https://www.etsy.com/listing/540268160/1-star-trek-tng-set-blueprint-epi-icarus

They give the best close up shots of the small science lab and the battle bridge + ready room layouts that I've seen thus far.

Also, obviously, the gym layout from Icarus factor.

Also, Starbase 515's exterior from Samaritan Snare:
https://www.etsy.com/au/listing/540272048/1-star-trek-tng-set-blueprint-epi?ref=related-2

Ferengi Bridge and Hathaway engineering:
https://www.etsy.com/au/listing/554070969/1-star-trek-tng-set-blueprint-epi-peak?ref=related-3

And this:

https://www.astromart.com/classifieds/details.asp?classified_id=945597

I provided the last link in an earlier post, it claims one image to be the Hathaway Engineering, but it did not match at all, to many walls. The Link you provided above it marked Hathaway Engineering is a lot closer. It does have a few details wrong, it does not show the door behind Riker as he enters, and the panel on the lower left is different. In the episode it was one panel area in this image, it is two. But it is the closest to the Hathaway Engineering so thanks for the links.
 
Hey Redgeneral, it's been awhile since we've heard from ya! Are you still working on the voyager sets?

Also has anyone seen anything surface from Discovery? I'm curious how they have their sets laid out. It would appear that they redressed the quarters of the shenzhou to the Discovery and seem to use that room as several others by removing a wall here or there.
 
I've been offline for a while due to an accident - I fell down the stairs, broke a bone in my foot and injured my back. I'm currently stuck on the sofa with my foot up.

It's a little frustrating as I was part way through drawing up the corridor blueprint.

Depending on how well I heal, I hope to get back to work on the plans end of December/ start of January.
 
If you are not already a member then please register an account and join in the discussion!

Sign up / Register


Back
Top