Progress pics for the past week. Began work on the beveled wall display above the Chief Engineeer's console. In the process I noticed in building left of the console to the door that the Steve Sardanis "Journey To Babel" floor plan for the wall does not agree with the TOS stills. So planning on another session of cross checking stills later when finalizing this part of Engineering. Set that aside for now. Decided to focus on installing finalized panels for the corridors. Spent the past week building panels. Began to install them swapping out with the initial study panels. Ran out of wood strips for the footers and the dividers. So tomorrow night visiting a hobby store to stock up on those. Setting a goal to have the majority of the panels in place before the weekend.




Last edited: