View Single Post
Old March 6 2010, 08:12 PM   #362
wjaspers
Lieutenant Commander
 
wjaspers's Avatar
 
Re: WIP - TMP Enterprise, deck by deck

Bernard Guignard wrote: View Post
When I first saw the doors in the foward Position I thought that it was a hallway going to the turboelevator shaft. So I came up with this variation


Great work by the way.
Nice, however, like the bleuprints of the bridges at the LCARS database, your bleuprint is not long enough.
Compare this: you have the airlock right behind the turbolifts, look at the outside of the bridge module, there is a lot of space between the turbolifts and the airlock.
On this bleuprint and the ones on the LCARS database there is no room for that thingie on top with the navlight.

Now for your solution with the placement of the doors and the lifts in its original position, had not thought about that, creative but in the movie, you can see the turbolift.

You could also imagine that the turbolift comes up in its original position, and moves a few meters horizontal to get in the new position (think turbolifts can move vertical and horizontal).
wjaspers is offline   Reply With Quote