Over the weekend a friend and I moved about a thousand dollars worth of lumber and tools into the stage, along with a few portable set pieces already constructed. I started building the platforming for the back area of the set.
And I've already managed to draw my own blood with a 1/2 inch drill bit, so we'll consider the stage properly christened.
Hopefully in a week or so I'll have pictures to post, however preliminary.